SCOTT WATER TREATMENT PLANT

Upgrades to existing facilities including a 9mgd expansion.
Site piping modifications, new sedimentation basin, two new granular
media filters, new chemical storage and handling building, filter to waste
basin, equalization basin, two gravity thickeners and an approximately
0.6 million gallon clear well.
New site grading and paving, retrofit existing contact basin with solids
removal equipment, renovation of the existing filter pipe gallery, remodeling
of the existing control building, and replacement of the existing diesel engine
generator .
Work also consisted of site work, electrical, instrumentation, control

General Contractor: Slayden Construction

Owner: McMinnville Water and Light